yes
C. Dilly Rani and R. Nagarajan
In this article, a new algorithm for searching Mann-Whitney minimum spanning tree in a critical path network having fermeatean pentagonal fuzzy soft edge length is presented. The proposed algorithm is based on matrix approach to design un-directed fermeatean fuzzy weighted connected graph. Also, we provide numerical example to check the validity of the proposed algorithm using score function and accuracy function.
இந்தக் கட்டுரையைப் பகிரவும்